Tender floated for works at Chennai Metro Rail ProjectIllustrative image – not actual.
The Chennai Metro Rail (CMRL) has floated tender for works at the Corridor-3 of Chennai Metro Rail Project Phase-II.

The scope of work envisages construction of four underground stations at Otteri Pattalam Perambur Barracks road and Kellys and works other than diaphragm wall of two underground stations at Ayanavaram and Puraisaiwakkam station cum crossover box in Corridor-3.

The work will be completed in a period of 51 months at a cost of Rs 898 crore.

← All latest storiesBack to top →