Illustrative image – not actual.
The Maharashtra Metro Rail Corporation has floated a tender for an elevated viaduct for Reach-3A of Nagpur Metro Rail Project (NMRP) Phase-II.
Under the scope of work, the design and construction of elevated metro viaduct of length 6.414 km between ch 18218.586 m to ch 24633.194 m in Reach-3A will be carried out, in a 30-month work completion period.
The project is valued at Rs 380 crore.
The bid submission deadline is 15 September, 2023.
