Illustrative image – not actual.
The Ministry of Road Transport and Highways (MoRTH) has invited bids for construction of iconic hybrid cable stayed and suspension bridge across Krishna river on NH-167K.
The bridge will extend from design chainage km 87.360 to km 88.437 km in the states of Telangana and Andhra Pradesh. The work will be executed at an outlay of Rs 963 crore.
The engineering, procurement and construction (EPC) contract is to be completed within a stipulated period of 30 months. This will be followed by a maintenance period of 10 years.
The bid submission end date is 28 Nov, 2023.
