Illustrative image – not actual.The Gujarat Rail Infrastructure Development Corporation has floated tender for the proposed new BG line rail connectivity from Nabhoi to Dholera logistics station from ch 7.500 to ch 22.000 total length of 14.5 km in Bhavnagar division in the Western Railway of Gujarat.
The work will be completed in a period of 18 months at a cost of Rs 213 crore.
The work will be completed in a period of 18 months at a cost of Rs 213 crore.
