Illustrative image – not actual.The Uttar Pradesh Metro Rail Corporation has floated tender for Mass Rapid Transit System (MRTS) project at Kanpur.
The scope of work involves design and construction of TBM tunnel, cut and cover tunnel, underground ramp from Kanpur Central end of Nayaganj station to elevated ramp after Transport Nagar and three underground metro stations (viz. Kanpur Central, Jhakarkatti and Transport Nagar) including architectural finishes, E&M, TVS, ECS etc on Corridor-1 of Kanpur MRTS Project.
The work will be completed in 36 months at a cost of Rs 1,250 crore.
The scope of work involves design and construction of TBM tunnel, cut and cover tunnel, underground ramp from Kanpur Central end of Nayaganj station to elevated ramp after Transport Nagar and three underground metro stations (viz. Kanpur Central, Jhakarkatti and Transport Nagar) including architectural finishes, E&M, TVS, ECS etc on Corridor-1 of Kanpur MRTS Project.
The work will be completed in 36 months at a cost of Rs 1,250 crore.
