Illustrative image – not actual.The Maharashtra Rail Infrastructure Development Corporation has floated tender for construction of cable stayed road over bridge (ROB) near Byculla railway station.
The ROB will come up at three km/16-18 between Sandhurst Road-Byculla Stations on CSTM-Dadar section in Mumbai division of Central Railway.
The work will be completed in a period of 11 months at a cost of Rs 169.44 crore.
The ROB will come up at three km/16-18 between Sandhurst Road-Byculla Stations on CSTM-Dadar section in Mumbai division of Central Railway.
The work will be completed in a period of 11 months at a cost of Rs 169.44 crore.
