Tender floated for construction of new BG line from Arariya to GalgaliaIllustrative image – not actual.
The Northeast Frontier Railway has invited bids for construction of new BG line from Arariya to Galgalia in West Bengal. 
 
The scope of work includes construction of five B class, four D class RBG room, high level platform, PP shed, FOB with ramp, circulating area, approach road, OH water tank 50,000 capacity, deep tube well and earthwork in filling to form embankment including blanketing, construction of minor bridges (14 nos), RUB (four nos), trolley refuges, drain, diversion road and other ancillary works from field ch 3.35 km to ch 4.60 km for Rahmatpur station, ch 9.10 km to 10.40 km for Bansbari Halt, ch 15.65 km to 16.75 km for Khawaspur Halt, ch 24.85 km to 26.00 km for Lakxmipur station, ch 38.40 km to 39.10 km for Bardha Halt, ch 49.60 km to 50.60 km for Kaliaganj station, ch 55.30 km to 56.10 km for Teragachh Halt in connection with construction of new BG line from Arariya to Galgalia in West Bengal. 
 
The estimated value of the work is Rs 134.68 crore with completion period of 16 months.
← All latest storiesBack to top →