TCS suggests waste plant at DeonarIllustrative image – not actual.

The Tata Consultancy Services (TCS), in its preliminary draft project report (DPR), has suggested setting up a waste-to-energy plant on 12 ha of Deonar dumping ground located in the suburbs of Mumbai.

The Brihanmumbai Municipal Corporation (BMC) is exploring three technologies to be used in this plant for the scientific disposal of garbage. The capacity of the plant will be 2,000 tonne capacity.

There are heaps of garbage lying on the land which needs to be cleared for setting up the plant. The BMC also needs to get permission from the environment ministry as the land falls in the coastal regulation zone (CRZ) III area.

Three technologies – bio-methanisation, waste-to-energy mass incineration, and segregation and compost – are being considered to be used in the waste-to-energy plant at Deonar.

← All latest storiesBack to top →