Illustrative image – not actual.The Tata Group is likely to set up a greenfield 200 MW gas based power plant in Gujarat. Though details of the Group’s plans are not available, it may be mentioned that the estimated cost of such a power plant is Rs.800 crore.
The Tatas already have a 55 MW captive facility at
Mithapur in Gujarat. This facility meets the power requirements of the group’s
chemical complex and soda ash facility in that area.
