Tata Sponge to set up captive power plantIllustrative image – not actual.

Tata Sponge Iron (TSI) plans to set up captive power plant at an estimated cost of Rs.24 crore at its sponge iron unit at Orissa. This power plant would be a cost reduction capital project.

 

← All latest storiesBack to top →