Illustrative image – not actual.Tata Power Company in an effort to strengthen its presence of renewable energy in its 2,300 MW portfolio is planning to set up two power plants each with a capacity to generate 5 MW of power. The power major signed an MoU with the Gujarat government on 12 January 2009, in this regard.
The company will develop the geothermal power plant in the first phase and solar based power plant subsequently. Tata Power is yet to finalise the suitable location for both the power plants.
