Tata Power, Doosan ink deal for Mundra UMPPIllustrative image – not actual.

Tata Power Co has signed a contract with Doosan Heavy Industries & Construction Co, Korea for the 4,000 MW Mundra Ultra Mega Power Project (UMPP) in Gujarat.

The contract for complete boiler includes super critical boilers for the 5 units of 800 MW each, based on super critical technology required for such large sized units. The technical scope with clear terminal boundaries and interface scope for boiler includes supply of super critical steam generator, air and flue gas system, auxiliaries, fuel oil systems, electrostatic precipitators and boiler field instrumentation.

Doosan's scope of work also includes civil works for boiler, ESP area and for complete services including custom clearance, inland transportation, site handling, erection, commissioning and performance testing to make it an end-to-end scope for boiler.

The company had recently announced the acquisition of Coastal Gujarat Power, a special purpose vehicle (SPV) formed for Mundra UMPP.

Also See:

PFC releases bid bonds to six Mundra UMPP bidders (28-Apr-07)

Related Links:
Project profile

ultramega5
← All latest storiesBack to top →