Tata Power commissions Mundra UMPP in Gujarat Illustrative image – not actual.

Tata Power has fully commissioned the Ultra Mega Power Project (UMPP) at Mundra in Gujarat.

The 4,000 MW UMPP has become fully operational with the synchronisation of the unit V of 800 MW. With the synchronisation of the fifth unit, the thermal power generation capacity of Tata Power stands at 7,647 MW and the generation through renewable sources such as hydro, wind and solar stands at 852 MW.

Related Link:
Project profile
 


 

← All latest storiesBack to top →