Illustrative image – not actual.Tata Power, on 12 December 2011, commissioned its effluent treatment plant at Jojobera, Jamshedpur in Jharkhand.
The plant has a capacity of 100 cubic mtrs per hour and is based on the proven solid–liquid separation technology. Using this technology, the effluent water can be used as clarified water upon treatment. The water quality generated from the treatment plant meets with the industry’s specifications; turbidity is less than 10 NTU. The state-of-the-art equipment includes flash mixer, flocculator, tube settler, RCC clarified water storage tank and dual media filter. The technology allows the plant to have low operations and maintenance cost while maintaining excellent product quality.
