Illustrative image – not actual.Tantia Constructions- Chennai Container Terminal JV has bagged an order worth Rs 91.7 crore from Northern Railway.
The scope of work includes construction of 1.80 km long tunnel on realigned path and carrying out re-profiling work in balance length of existing tunnel no. 1 including blanketing, earthwork & construction of side drain etc in zone E-2 between tunnel no-1 Katra end to road over bridge Sambal on Udhampur- Katra section in connection with Udhampur- Srinagar- Baramulla rail link in Jammu & Kashmir.
Related Links:
Project profile
