Illustrative image – not actual.The Tamil Nadu government is planning a Rs.369 crore Tamiraparani-Karumeniyar-Nambiyar river interlinking project.
The river linking project aims to utilise about 20 per cent of the surplus quantum of 13.76 thousand million cubic ft, available on an average annually, in the Tamiraparani river. As per the plan, 2.765 thousand million cubic ft of surplus water will be diverted through the existing Kannadian channel and the formation of a canal. The 6.5 km long Kannadian channel's carrying capacity will be increased from 450 cusecs to 3,680 cusecs. A canal will be formed for 73 km, terminating with M.L. Theri, which is a sand dune. The canal can carry 3,200 cusecs of water. There will be a number of link canals that will connect the 73-km-long canal with a host of tanks in the basins of Karumeniyar and Nambiyar and the Manimuthar river's distributory. The main canal will link with the river Pachayar. The project will benefit 50 villages in Tirunelveli and Tuticorin districts. Irrigation facilities will be provided to about 23,040 ha in the two districts.
The project will be completed in three years. It will be implemented in four phases with each phase containing 18 packages. Bids for nine packages were opened on 21 January 2009 and 18 firms have responded. The bids for the remaining packages will be opened on 12 February 2009 and the work order for all will be issued by the end-February 2009.
Chief Minister M. Karunanidhi will lay the foundation stone for the project at Palyamkottai on 9 February 2009.
