Illustrative image – not actual.Tamil Nadu Chief Minister C Joseph Vijay has announced a Rs 33,066 crore Tamil Nadu Transmission Improvement Scheme to strengthen the state’s power transmission network.
The scheme will involve the development of 196 new substations and transmission lines covering 15,000 km, along with strengthening of existing transmission infrastructure. The Chief Minister also announced a new supercritical thermal power station at Thoothukudi at an estimated cost of Rs 20,800 crore. In addition, a Rs 1,762 crore project will be implemented to improve power distribution infrastructure in Chennai. Although the state has a strong renewable energy base in wind and solar power, generation from these sources is intermittent. The government is therefore focusing on battery storage technologies to store surplus renewable electricity for use when required.
The projects are aimed at strengthening transmission and distribution infrastructure, and improve supply to major consumption centres, including Chennai. The announcements come as Tamil Nadu seeks to address increasing electricity requirements while expanding renewable energy generation.
