Suzlon inks two contractsIllustrative image – not actual.

Suzlon Group’s UK subsidiary, REpower UK, has signed two new contracts.

The company has signed contracts totalling 16.4 MW for supplying wind turbines for a new wind farm at Wear Point in Pembrokeshire, South Wales, as well as the Avonmouth wind farm in south west England.

Wear Point, jointly owned by infrastructure company John Laing and developer Infinergy, will consist of four MM 82 turbines. Construction work at Wear Point will commence in summer 2013 and will be completed by December 2013.

Avonmouth Wind Farm, located at the Bristol sewage treatment works nearby, is being developed by Triodos Renewables Plc and GENeco – Wessex Water’s waste-to-energy company – and will consist of four MM 92 turbines. These are part of a wider strategy to increase renewable energy at Wessex Water's sewage treatment works. They will be part of a renewable energy mix of wind and anaerobic digestion which is already in operation at the site.

← All latest storiesBack to top →