Illustrative image – not actual.Suzlon Group has signed a contract with Mitsui & Co for a 106.6 MW wind farm in Victoria, Australia.
Suzlon group subsidiary, REpower System SE, announced the conclusion of an EPC contract with Mitsui & Co (Australia), to deliver 52 wind turbines with a total rated output of 106.6 MW for the Bald Hills wind farm in Australia.
The contract is combined with a service contract for the next 10 years, with a further five year option. It is the first contract for REpower with Mitsui & Co which is on a turnkey basis.
The turbines are to be delivered in 2014 and to be commissioned in 2015. They are expected to produce upto 3,80,000 MWh of electricity per year, enough to power over 62,000 homes.
The REpower MM92 turbines, each with a rated power of 2.05 MW, a hub height of 80 mtr and a rotor diameter of 92.5 mtr, are destined for the Bald Hills wind farm near Tarwin Lower.
