Stone laid for Bengal-Sikkim broad gauge railway lineIllustrative image – not actual.

Dr Hamid Ansari, Vice President of India, laid the foundation stone for the broad gauge railway line between Rangpo (Sikkim) and Sevoke (West Bengal) at Sikkim Mining Ground, Rangpo, on 30 October 2009.

The rail project to link Sevoke in Siliguri with Rangpo in East Sikkim with a broad gauge rail spanning 52.7 km is estimated to cost Rs 1,339.48 crore.

Five stations have been planned - Raing, Gielkhola, Teesta Bazaar, Melli and Rangpo. Besides, 100 bridges with four manned level crossings along the track are expected to be part of the project. A total of 13 tunnels are likely to be constructed for the project, with the longest tunnel being 1,814 mtrs.

Currently, a final location survey to fix the alignment of this route is underway.

Indian Railway Construction Company is entrusted with the execution of the project which is scheduled to be completed by 2014.

Related Links:
Project profile
 

← All latest storiesBack to top →