Illustrative image – not actual.On 19 May 2007, Prime Minister, Dr.Manmohan Singh is scheduled to lay the foundation stone for Haryana Power Generation Corporation's 1,200 MW coal-based power project at Khedar in Hisar district.
The company has also facilitated loan arrangements from various government agencies in order to ensure timely construction and commissioning of the project. The agencies that offered financial assistance include Rural Electrification Corporation of India (REC), Power Finance Corporation and the Nationl Capital Region Planning Board (NCRPB).
It is learnt that a loan of Rs.135 crore sanctioned for the year 2006-07 has already been drawn for the purpose.
The balance will be drawn in two tranches. Besides, the REC has sanctioned a loan of Rs.1,536.03 crore with a repayment period of 15 years and Commercial Operation Date (COD) in 60 quarterly installments. Similarly, Rs.1,453 crore has been sanctioned by the Power Finance Corporation with a repayment period of 15 years after a 38 months moratorium period. The total loan period will be 18 years.
Also See:
REL bags Rs.4,200 crore EPC contract HPGC, UPRVUNL (31-Jan-07)
Related Links:
Project profile
