Sterlite Power wraps up India’s first live-line reconductoring projectIllustrative image – not actual.
Sterlite Power has successfully completed India’s first live-line project in Bengaluru, Karnataka, on 2 April 2019.

The company successfully undertook the reconductoring of a 66 kV transmission line connecting Bengaluru’s electronic city under live-line conditions.

The project upgraded the existing line to double its power transfer capacity. High-performance conductor installed in the lines will provide better clearance from the ground and nearby buildings.

← All latest storiesBack to top →