Illustrative image – not actual.Sterlite Power Transmission has commissioned the Northern Region Strengthening Scheme 29 transmission project two months ahead of its schedule. The project has been set up at a cost of Rs 3,000 crore.
The 414 km long key project will ensure reliable power access for Kashmir by augmenting Jammu & Kashmir’s power transmission capacity by at least 33 percent. The company deployed helicranes in the Pir Panjal range to overcome challenges of high altitude, snow and inaccessible terrains.
The evacuation of 1,000 MW shall play a vital role in addressing the power deficit in the region, especially during winter months.
