Sterlite Industries synchronises power unit at TuticorinIllustrative image – not actual.

Sterlite Industries (India) has synchronised a 80 MW a captive power plant (CPP) at Tuticorin in Tamil Nadu, on 30 September 2012. 

The 80 MW unit is a part of its 160 MW thermal power plant at Tuticorin. The power from the first unit will be predominantly used for captive consumption at its Copper Smelter operations at Tuticorin.
 
Related Links:
Project profile
 
← All latest storiesBack to top →