Illustrative image – not actual.
In a major engineering milestone for Mumbai Metro Line 5 project, the Mumbai Metropolitan Region Development Authority (MMRDA) has successfully launched a 65-mtrs.-long steel span over the Vasai-Diva railway line.
The span, part of the Thane-Bhiwandi segment of the Metro corridor, has been erected at Anjurphata in Bhiwandi and represents a significant feat in infrastructure execution within MMR. This key section involves a 456-tonne open web girder steel bridge that links two metro piers over the Central Railway tracks, specifically between Kharbav and Bhiwandi stations. Positioned at a height of 20 mtrs. above the ground, the span is a crucial component of the viaduct that will eventually support the Metro Line 5.
When fully operational, Mumbai Metro Line 5 will stretch across 24.9 km, connecting Thane to Kalyan via Bhiwandi. It will feature 17 stations and predominantly run on an elevated alignment, with the exception of a three-km underground section through Bhiwandi. This alignment aims to improve public transit connectivity between key urban and semi-urban centres in the Mumbai region.
The erection of the steel span was executed through an intricate and carefully planned overnight operation. It required precise coordination between the MMRDA, Central Railway, and local traffic police to ensure the safety and efficiency of the lift over an active railway line.
