Illustrative image – not actual.The Union Ministry of Steel has requested the Union Ministry of Petroleum & Natural Gas to allocate gas for SAIL's proposed 1,000 MW captive power project in Uttar Pradesh.
The power plant is to be set up at the SAIL's Jagdishpur steel unit. After getting the Ministry nod on allocation of gas, SAIL might look for a partner to jointly develop the plant.
