Illustrative image – not actual.
The Tamil Nadu government and the National Highways Authority of India (NHAI) are likely to share construction work on the 42 km long Chennai airport-Chengalpet elevated corridor project.
The state government will construct the portion between Tirusulam (airport) and Perungalathur, while NHAI will build the stretch between Perungalathur and Chengalpet.
A consultant has been appointed by NHAI, which will start preparing a detailed project report (DPR) in January 2017 and will submit it in six months.
The authority intends to expand the four way corridor into an eight lane tollway from Perungalathur to Tindivanam. Twenty two km from Perungalathur to Chengalpet will be an elevated corridor.
The estimated cost of the project is Rs 2,200crore.
The government also indicated renewed interest in revival of the stalled project Chennai Port-Maduravoyal elevated expressway which will provide a connection to the Chennai Bypass Road that links Puzhal in the north and Perungalathur in the south.
