Spectrum invite bids for gas based power plantIllustrative image – not actual.

Spectrum Power Generation plans to expand the capacity of its gas based combined cycle power project from the current 208 MW to 1,350 MW.

In Phase I, the company intends to set up a 350 (+) MW power unit at the existing plant at Komaragiri village in East Godavari district of Andhra Pradesh.

Spectrum has invited bids from interested parties for design, engineering, manufacture, supply, construction, erection and commissioning of the main plant equipment of the plant.

The last date of submission of bids is 20 January 2011.