Illustrative image – not actual.Southern Railway is planning to invest around Rs.650 crore over the next 10 years in port connectivity projects at Chennai, Tuticorin, Mangalore, Ennore and Cochin.
Southern Railway and Chennai Port are developing a master plan to redesign the rail yard inside the port. The Chennai port had already planned for a 15 km elevated road corridor to improve rail connectivity.
Recently, two additional lines between Madras Beach and Attipattu, a 19 km stretch, which connects the Chennai port, were sanctioned by the railway to double the handling capacity in the next 10 years. Third line between Kurukkupet and Ennore is ready for commissioning and work is in progress on the line beyond Ennore. With the availability of four lines, the railway will be able to use the two lines exclusively for freight and the other two for passenger services.
The railway is also planning for a 88.3 km new line at an estimated cost of around Rs.445 crore, to be developed under PPP model with Ennore Port bearing 50 per cent of the cost.
In Cochin, a new 8.8 km line, funded by the Ministry of Shipping and being executed by the Rail Vikas Nigam, will be laid from Idapalli station at Ernakulam-Trivandrum connecting Vallarpadam, at an estimated cost of around Rs.245 crore.
