Illustrative image – not actual.South Central Railway has issued a tender for an engineering, procurement, and construction (EPC) contract valued at Rs 565.84 crore.
The contract involves two main components: the construction of an important bridge (No. 57) over the Krishna River, with a 53x61 mtrs. span, designed for 25-ton axle loading, including foundation, sub-structure, and track works; and the development of infrastructure at Kothapalli Halt station, including a station building, CPM camp office, platform works, and approach track construction. The contract also covers earthwork for a 1033-mtrs. section at the Errupalem end and a 534-mtrs. section at the Namburu end of the bridge. This work is part of the new broad-gauge line between Errupalem and Namburu, running via Amaravati, in the Guntur division of Andhra Pradesh.
The last date for bid submission is 15 May, 2026.
