South Central Railway invites bids for Errupalem–Kothapalli new BG rail line projectIllustrative image – not actual.

South Central Railway has invited bids for an engineering, procurement and construction (EPC) contract for the construction of a new broad gauge (BG) railway line between Errupalem and Kothapalli Halt stations.

The stretch spanning from km 3.525 to km 24.800, covers a total length of 21.275 km, ann forms part of the larger Errupalem–Namburu via Amaravati new BG rail corridor in the Guntur Division of Andhra Pradesh. The estimated cost is Rs 415.69 crore, and the scope includes full EPC execution, covering design, procurement, construction, and commissioning of the rail line infrastructure. The proposed rail alignment is aimed at strengthening regional rail connectivity in Andhra Pradesh and improving transport access along the Amaravati corridor. The initiative is part of Indian Railways’ broader infrastructure expansion strategy focused on capacity augmentation, network decongestion, and improved connectivity across key growth corridors in southern India.

The last date for submission of bids is 18 June, 2026.

← All latest storiesBack to top →