Illustrative image – not actual.
The dam-top solar project of the Kerala State Electricity Board (KSEB) set up at Banasura Sagar Dam at Padinjarathara in Wayanad will be commissioned on 29 August, 2016.
State power minister, Kadakampally Surendran will commission the 400 kW project set up at a cost of Rs 4.29 crore.
Under the project, solar panels have been fixed to form a canopy on the dam-top road at a length of 285 mtr.
As many as 1,760 solar panels, each having a capacity of 255 watt have been installed on top of the dam. The project will generate five lakh units of power a year.
