Illustrative image – not actual.SKS Power Generation (Madhya Pradesh) has kept coal based power unit at Rahiwada, Amarwada in Chhindwara district of state, as told to ProjectsToday (PT).
The coal based power project expected to cost Rs 7,721 crore was kept on hold due to non-allocation of coal linkages from Ministry of Coal. The company had plans to set up a 1,320 MW coal based power unit based on supercritical technology at Rahiwada. It consists of two units with the capacity of 660 MW each. Land for the proposed project has already been acquired. The required coal was to be sourced from Western Coalfields (WCL) and South Eastern Coalfields (SECL).
Related Link:
Project Profile
