Illustrative image – not actual.On 23 April 2007, Satluj Jal Vidyut Nigam signed a memorandum of understanding (MoU) with Konkan Railway Corporation under the Ministry of Railways for providing consultancy services for geotechnical investigation and related design works for tunnels for Jammu & Kashmir project.
The highlights of the project are:
Construction of 90 km section of single Broad Gauge Railway line between Katra (Vaishno Devi) and Laole from KM 30 to 120 as part of Udhampur Srinagar-Baramula Rail Link project. The KRCL reach between Katra and Laole is passing through a very difficult terrain of Himalayan geology in 90 km reach. There are 40 tunnels where underground length is about 72 kms.
