Illustrative image – not actual.Sutlej Jal Vidyut Nigam (SJVN) has decided to drop the idea of constructing a 38-km-long tunnel in the much-hyped 775 MW Luhri hydro project.
The tunnel if built would have been one of the longest for a hydro project in Asia and would have led to the disappearance of the Sutlej river in the 50-km stretch. Also, nearly 78 villages would have been affected. Also, would have affected three districts of Kullu, Mandi and Shimla. The issues with regard to tunnelling have been the destabilisation of slopes, cracks and damages to houses and drying up natural water springs.
