Illustrative image – not actual.Sixteen construction firms have submitted bids to build 17.52 km Package-1 of 73.7 km Kanpur-Lucknow Expressway (NE-6) project after the National Highways Authority of India (NHAI) opened technical bids.
This six-lane access-controlled highway will be upgradeable to eight lanes and connect Shaheed Path in Lucknow with Azad Chauraha near Kanpur’s Ganga Bridge. It will run parallel to NH-27 and consist of a 3.375 km elevated portion between Amausi and Bani which lies under Package-1’s scope.
NHAI invited tenders for its construction under the hybrid annuity mode (HAM) model in September 2021 with a 2.5-year deadline and Rs 1,675.18 crore estimate.
The scope of work envisages construction of six-lane upgradable to eight lane of Kanpur Lucknow Expressway including spur from 10.980 km to 28.500 km in the state of Uttar Pradesh on hybrid annuity mode under Bharatmala Pariyojana (Package-I).
This six-lane access-controlled highway will be upgradeable to eight lanes and connect Shaheed Path in Lucknow with Azad Chauraha near Kanpur’s Ganga Bridge. It will run parallel to NH-27 and consist of a 3.375 km elevated portion between Amausi and Bani which lies under Package-1’s scope.
NHAI invited tenders for its construction under the hybrid annuity mode (HAM) model in September 2021 with a 2.5-year deadline and Rs 1,675.18 crore estimate.
The scope of work envisages construction of six-lane upgradable to eight lane of Kanpur Lucknow Expressway including spur from 10.980 km to 28.500 km in the state of Uttar Pradesh on hybrid annuity mode under Bharatmala Pariyojana (Package-I).
