Six-lane metalled road work resumesIllustrative image – not actual.

Construction of a six-lane metalled road alongside Kukrail nullah, from near UPTRON Chauraha (Samta Mulak Crossing) to Ring Road near Khurram Nagar, has at last gained momentum.


The 5.2 km long road-cum-railway overbridge (ROB) project was completed only in parts. The project was halted for over three years due to two land stretches coming in the way of the defence rifle range. The army had raised objections over construction in their rifle range.


The project’s work resumed when Lucknow MP and Union Home Minister, Rajnath Singh, wrote to Defence Minister, Manohar Parrikar, to give operational NOC to complete the project on Defence land.


PWD is the nodal agency for the project.


The project was sanctioned by the state government in 2009 to ease commuting hassles and travel time by almost 20-30 minutes from Ring Road and adjacent colonies — Vikasnagar, Sitapur Road, Kursi Road, Jankipuram, Sarvodaya Nagar, Khurram Nagar etc, up to Hazratganj and Gomtinagar.

← All latest storiesBack to top →