Illustrative image – not actual.Siemens AG, Germany, and Siemens India consortium has bagged an order from Chennai Metro Rail.
The order valued at Rs 305 crore is for power supply and overhead equipments. The scope of work includes design, supply, installation, testing and commissioning of complete power supply systems covering elevated and tunnel sections of the Rs 14,000 crore metro rail systems.
CMRL will receive electrical power from the Tamil Nadu Electricity Board (TNEB) for a maximum demand of 60 MVA from three 110 kV sub-stations being set up by TNEB at Koyambedu, Alandur and Chennai Central.
Three traction sub-stations will be set up under this contract to step-down the voltage from 110 kV to 25 kV A/C single phase for use for the traction purposes.
The order also provides for setting up of three auxiliary gas insulated sub-stations at Koyambedu, Alandur and Chennai Central to step down the 110 kV to 33 kV for supply of power to stations, air-conditioning systems, tunnel ventilation systems, lighting and other utilities at the stations.
Besides setting up these facilities, the contract includes comprehensive maintenance till end of a defect liability period of two years after the completion of the project.
Also See:
