Illustrative image – not actual.The Chennai-based Sical Logistics has started preliminary work of acquiring land in Panvel, near Mumbai, and Bangalore for container freight station (CFSs) facilities.
In Mumbai, it is planning for CFS cum ICD facility with rail connectivity. The company's own CFS in Tuticorin and the Mumbai CFS are expected to be operational by March 2009 to be followed by Bangalore CFS.
The road and rail based hubs will be developed over an area of 60 ha at a cost of Rs.120 crore for the road terminal and 28 ha at a cost of Rs.80 crore for the rail terminal. For the project, Sical has joined hands with Maharashtra Airport Development Co (MADC) and Gupta Coal as the joint venture partners. In both the special purpose vehicles (SPVs), Sical is the lead partner with 51 per cent stake, and MADC 26 per cent and Gupta Coal India has 23 percent stake.
Nagpur Sical Gupta Road Terminal, the SPV formed for development of the road terminal, is expected to achieve financial closer by December 2007. However, construction work is expected to begin by November 2007.
Also See:
Sical Logistics signs agreement for MIHAN road terminal (24-Aug-07)
