Illustrative image – not actual.Shreeji Infraspace has been declared the lowest bidder (L1) for the construction of a high-level long bridge over the Ujani Dam backwaters in Maharashtra.
The proposed bridge will be developed along the Baramati–Lakadi Kalas–Chandgaon Road (MDR-65), and is aimed at strengthening road connectivity between parts of Pune and Solapur districts. The bridge is expected to improve the movement of vehicles and goods across the backwater region while providing a more reliable transport link between the adjoining areas. The infrastructure development is expected to enhance regional connectivity and accessibility across the Pune–Solapur corridor.
Shreeji Infraspace’ L1 status positions it well for the contract award, subject to completion of the applicable tender and contractual formalities.
