Illustrative image – not actual.The Palakkad railway division is set to advance a series of infrastructure projects aimed at increasing the maximum permissible speed on the Shoranur-Mangaluru route from 110 kmph to 130 kmph within the next two years.
As part of an ongoing capacity augmentation programme, six loop lines and four holding yards are being developed across the corridor to improve train handling, facilitate crossings and overtakes, and support higher-speed operations. Railway officials said the upgrades are part of a broader initiative by Southern Railway that includes extensive improvements to track infrastructure, signalling systems, and safety measures. A significant portion of the speed enhancement work has already been completed. The loop line at Edakkad railway station has been sanctioned, while approvals for five additional loop lines are expected soon. Officials noted that the new facilities will help accommodate a greater number of passenger and freight services, addressing existing capacity constraints on the busy route.
Additional works include double distance signalling, track fencing at vulnerable locations, renewal of tracks over 250 km, and simultaneous upgrades of railway overbridges and yards to enhance operational efficiency and punctuality.
