Illustrative image – not actual.The Shiradi Ghat in Karnataka which connects Mangaluru with Bengaluru was supposed to be thrown open for traffic on 1 July 2018. However, the bridge will be opened after 15 days.
Works on the approach roads on both sides of three minor bridges -- a total stretch of 380 mtr, shoulders on both sides of the road and some retaining walls -- have been hampered because of the heavy rains that lashed the ghat.
The works are being carried in full swing and expected to get over in the next 15 days and the stretch of 12.30 km will open for traffic by 15 July 2018.
