Illustrative image – not actual.
South East Central Railway (SECR) has invited request for qualifications (RfQs) for construction of Raigarh-Bilaspur 4th line in the state of Chhattisgarh.
The scope of works includes construction of a 133 km long railway line including engineering, electrification, signalling and tele-communication works through engineering, procurement and construction (EPC).
The indicative cost of the project is Rs 1,100 crore. The proposed project is scheduled to be completed in 36 months.
