Second unit of Bongaigaon Thermal Power Project commissionedIllustrative image – not actual.

The second unit of 250 MW of the Bongaigaon Thermal Power Project (3 x 250 MW) has been commissioned by NTPC.

The commissioned capacity of the thermal power project has become 500 MW.

 

← All latest storiesBack to top →