Sarkhej-Dholera Rail Corridor envisaged as cost-effective semi high-speed rail projectIllustrative image – not actual.

Railway officials have said that the proposed Sarkhej-Dholera semi high-speed rail corridor in Gujarat will be substantially cheaper than other advanced rail systems in India despite supporting higher operational speeds than the Delhi-Meerut Regional Rapid Transit System.

The Delhi-Meerut RRTS, developed by the National Capital Region Transport Corporation, has a construction cost of nearly Rs 336 crore per km on 1,435 mm standard gauge tracks. Although the corridor has a design speed of 180 kmph, trains operate at 160 kmph. In comparison, the Mumbai-Ahmedabad High-Speed Rail corridor remains India’s costliest rail infrastructure project, with an estimated construction cost of around Rs 358 crore per kilometre and operational speeds of up to 320 kmph. Officials noted that the Sarkhej-Dholera corridor, will operate on the broader 1,676 mm gauge used by conventional Indian Railways lines, making it more economical than standard gauge high-speed systems. They attributed the variation in construction costs among projects to differences in engineering complexity, advanced technology requirements, elevated structures and tunnelling work.

On 13 May, 2026, the Union Cabinet cleared the 134-km double-line project connecting Sarkhej in Ahmedabad with Dholera in Gujarat, with an estimated investment of nearly Rs 20,667 crore. The project is expected to serve as a cost-efficient model for future semi high-speed railway corridors while supporting industrial growth and improved connectivity in Gujarat.

← All latest storiesBack to top →