Illustrative image – not actual.Steel Authority of India (SAIL) will supply 8.3 million tonne of iron ore annually to its Bokaro Steel Plant through a modern slurry pipeline system, marking a first for the company and the longest slurry pipeline in India’s steel sector.
The project is part of SAIL’s Rs 15,000 crore expansion programme aimed at increasing Bokaro’s crude steel production capacity from 4.65 million tonnes per annum (MTPA) to 7.25 MTPA and hot metal production capacity to 7.55 MTPA. The new system will transport finely ground iron ore mixed with water directly from SAIL’s Gua and Bolani mines to the plant, significantly reducing dependence on railway rakes and improving supply reliability. Iron ore from both mines will first reach Jamda before being transported through a 258-km main pipeline to Bokaro. The pipeline has been designed with a future capacity of up to 16 million tonne annually to support planned production expansion.
The project also incorporates a sustainable water management system, under which water used for slurry transportation will be returned to the mines through a separate pipeline for reuse.
