Illustrative image – not actual.Steel Authority of India (SAIL) has invited bids for the installation of a water system comprising new raw water pump house with associated pipeline infrastructure for the upcoming 2,000 TPD BOO oxygen plant at Bhilai Steel Plant, Chhattisgarh.
The contract, to be executed on a turnkey basis, falls under Package-1 and includes the construction of RCC sumps, MS pipelines, valves, pumps, electrical systems, and automation facilities. The scope also covers the development of associated infrastructure required for ensuring uninterrupted water supply to the oxygen plant. Water supply for the system will be provided through two NB 250 pipelines connected to the new raw water pump house. The raw water will be sourced from an existing NB600 pipeline linked to the intake pump house at Maroda-2 reservoir, which is part of the 7.5 MT modernization phase. The project is aimed at strengthening essential utility infrastructure to support the upcoming oxygen production facility and ensure operational reliability at Bhilai Steel Plant.
The last date for submission of bids is 09 June, 2026.
