Sadbhav Infrastructure declared L1 bidder for NHAI projectIllustrative image – not actual.

Sadbhav Infrastructure has emerged as the lowest (L1) bidder for a road project by National Highways Authority of India (NHAI).

The project involves six laning of the greenfield proposed Udaipur bypass [connection between NH-76 at existing 118.500 km at Debri to NH-8, 287.400 km at Kaya Village (Udaipur bypass length 23.883 km)] on Hybrid Annuity Mode, Package-IV, under NHDP Phase-V in the state of Rajasthan.

The bid project cost is Rs 891 crore and the construction period is 730 days from the appointed date.

 

← All latest storiesBack to top →