Sabarmati-style riverfront makeover set for Dahisar riverIllustrative image – not actual.

Union Minister Piyush Goyal has announced a rejuvenation and beautification plan for the Dahisar River, modeled after the Sabarmati Riverfront.

The project covers a 4.5 km stretch on both banks, aiming to transform the waterway into an eco-tourism and recreational hub for North Mumbai. Planned features include a boating facility, decorative lighting, and a model for sustainable urban water management. To ensure year-round water flow, seven rainwater harvesting facilities are planned within the Sanjay Gandhi National Park, where the river originates. The announcement coincided with the commissioning of two automated sewage treatment plants (STPs) at Sukurwadi and Indira Nagar, with a combined capacity of 6.5 MLD. While treated water currently replenishes the river, the BMC plans to sell it for non-potable uses in the future. The Rs 246-crore project, which began conceptualization in 2014, is now 99 percent complete in its first phase.

Efforts are ongoing to clear remaining encroachments and relocate 1,640 project-affected persons. Additionally, Minister Goyal has directed the BMC to prioritize dredging and desilting to mitigate flood risks in the region.

← All latest storiesBack to top →