S Kumars in talks with BHEL to acquire stake in Maheshwar power projectIllustrative image – not actual.

S Kumars is in talks with Bharat Heavy Electrical Ltd to acquire an equity stake in Shree Maheshwar Hydel Power Corporation Ltd (MHPCL), which is setting up the 400 MW Maheshwar hydel power project in Madhya Pradesh. This move follows the withdrawal of Siemens of Germany and ABB of Portugal, who together held 8.43 per cent equity in the MHPCL.

 

Meanwhile, the promoters have also asked financial institutions (FIs) to raise their equity stake in MHPCL to 49 per cent from their present equity of 22.51 per cent. The offer to the FIs comes after the withdrawal of the foreign promoter Ogden Energy of the US.

 

Ogden Energy is not the first foreign promoter to back out from the Rs.2,254 crore project. Earlier, Bechtel of the US, Pacific Generation Devp. Co. of the US and Bayernwerk of Germany withdrew from the project due to various reasons including delays, problems regarding rehabilitation of affected persons and ecological considerations.

← All latest storiesBack to top →